The Ministry of New and Renewable Energy (MNRE) has added 2,018 MW of solar cell manufacturing capacity to the Approved List of Models and Manufacturers (ALMM) List-II, increasing the total capacity to 49,008 MW from 46,990 MW.
The Ministry of New and Renewable Energy (MNRE) has added 2,018 MW of solar cell manufacturing capacity to the Approved List of Models and Manufacturers (ALMM) List-II, increasing the total capacity to 49,008 MW from 46,990 MW.