Power Grid Corporation of India (POWERGRID) has commissioned a transmission project to evacuate renewable energy in Koppal and Gadag, Karnataka. The ‘Transmission Scheme for integration of Renewable Energy Zone (Phase-II) in Koppal-II (Phase-A & B) and Gadag-II (Phase- A)’ was commissioned on October 23, 2026. It was entrusted to POWERGRID Koppal Gadag Transmission, a subsidiary of POWERGRID, which was amalgamated with POWERGRID Khavda II-C Transmission on March 1, 2026.