NTPC Green Energy Limited has invited bids for a 3,300 MWh Battery Energy Storage System at the NTPC REL Khavda Solar Plant in Gujarat. The project, split into four blocks, requires a 25-year lifespan battery, strict performance metrics, and full turnkey execution. Bids, available from June 5 to June 15, 2026, will culminate on June 25, 2026.

The post NTPC Green Energy Floats EPC Tender For 3,300 MWh BESS Project At Khavda Solar Plant In Gujarat appeared first on SolarQuarter.