MKC Infrastructure Limited has initiated the NTECL Battery Energy Storage System (BESS) 300 MWh Project at the Vallur Thermal Plant in Tamil Nadu, enhancing energy storage capacity. This initiative aims to stabilize the grid, support renewable energy integration, and contribute to India’s clean energy goals, improving the reliability of electricity networks.

The post NTECL And MKC Infrastructure Launch 300 MWh BESS Project At Vallur, Tamil Nadu appeared first on SolarQuarter.