Himachal Pradesh State Load Dispatch Centre (HPSLDC) has issued the draft procedure for the grant of short-term green energy open access (GEOA) through intrastate transmission systems. Eligible entities must be consumers with a contracted demand or approved load of at least 100 kW, either through a single or multiple connections aggregating at least 100 kW. These multiple connections must be located in the same electricity division of a distribution licensee. Captive consumers are exempt from the eligibility requirement for contracted demand or approved load, whether through a single or multiple connections.