The Ministry of Power (MoP) has proposed amendments to the tariff-based competitive bidding guidelines for solar, wind-solar hybrid, firm and dispatchable renewable energy (FDRE), and battery energy storage system (BESS) projects to incorporate domestic content requirements for energy storage systems.