Kabra Extrusiontechnik Limited has commissioned a 10 MW/20 MWh Battery Energy Storage System in Phalodi, Rajasthan, for RVPNL. This system enhances grid stability and supports renewable energy integration. The development was reported to the BSE and NSE on September 9, 2026, under SEBI regulations, signed by Hiren Vala.
The post Kabra Extrusiontechnik Commissions 10 MW/20 MWh BESS Project in Rajasthan appeared first on SolarQuarter.
