The Andhra Pradesh Electricity Regulatory Commission clarified that existing solar rooftop systems with capacities between 500 kWp and 1000 kWp, established before the 2023 regulation, are exempt from new capacity limits. They will maintain their original billing and metering arrangements, providing certainty and relief to developers and consumers in the state.
The post APERC Clarifies Net Metering Continuity For Existing Solar Rooftop Projects Above 500 kWp In Andhra Pradesh appeared first on SolarQuarter.
