The Rajasthan Rajya Vidyut Prasaran Nigam (RVPNL) has issued draft guidelines mandating that battery storage systems installed with renewable energy captive and open access projects be charged during solar peak hours using power from their own generation.The draft details procedures for charging and discharging battery storage systems installed alongside wind-solar and solar projects.Such projects must be installed under the Rajasthan Integrated Clean Energy Policy, 2024, and the battery storage systems must be designed for two cycles.