PFC Consulting has invited bids to develop an interstate transmission system (ISTS) to evacuate 14 GW of renewable power from Lakadia (Phase-II: 7.5 GW), Jam Khambhaliya (Phase-II: 5.5 GW), and Jamnagar (Phase-I, Part C: 1 GW) in Gujarat. The scope of work includes the establishment, operation, and maintenance of the project on a build, own, operate, and transfer basis, and the completion of all project activities, including survey, detailed project report formulation, finance, project management, design, engineering, construction, and commissioning.